Risk Assessments and Method Statements: Getting RAMS Right
Advice
2026-04-29 16:02:43.372486+00
Author Nigel Lewis BA (Hons) CMIOSH OSHCR PIEMA

Risk Assessments and Method Statements (RAMS) are widely used across UK construction projects and are frequently scrutinised by HSE inspectors. Common issues include documents that are generic, reused from previous projects, and do not reflect the specific work being undertaken. Effective RAMS are essential for establishing safe working practices on site and should not be treated as a formality.
What Each Document Actually Does
A risk assessment identifies hazards associated with a task, evaluates the likelihood and severity of harm, and records the controls in place to reduce risk. A well-structured risk assessment should clearly explain how each hazard will be managed, rather than simply listing hazards without further detail.A method statement sets out, step by step, how a task will be carried out safely, incorporating the controls identified in the risk assessment. Together, these documents provide a safety case for a specific activity on a specific site. RAMS must be tailored to the project; generic documents that could apply to any site do not meet compliance requirements.
Why Generic Documents Fail
Generic RAMS are ineffective because they do not provide clear instructions for the specific conditions present on site. If a risk assessment does not consider factors such as ground conditions, proximity of other trades, worker competence, or seasonal risks, it is not suitable for use. Inspectors and principal contractors routinely check for this, and inadequate RAMS are a common factor in enforcement action and post-incident investigations.RAMS must be reviewed and updated whenever site conditions change. For example, if weather, ground conditions or site access arrangements differ from those originally assessed, the RAMS should be revised before work continues.
Who Prepares and Who Reviews
Under CDM 2015, contractors are required to produce RAMS that are suitable for their scope of work. The Principal Contractor must review and accept subcontractor RAMS before work commences. This review should be a thorough assessment to ensure that the controls described are proportionate and practicable. CDM duty holder responsibilities require that this oversight is maintained and not delegated without proper review.The individual preparing or reviewing RAMS must be competent. Meeting the competent person standard is essential; producing a document that appears adequate is not sufficient without the knowledge to assess whether the controls are effective.
Turning Documents into Practice
RAMS are effective only when the workforce understands them and supervisors ensure compliance. Briefing workers on the method statement before starting a task, and recording that briefing, is standard practice on well-managed sites. Toolbox talks and pre-task briefings should confirm that controls are understood and agreed, rather than simply reading the document aloud.Senior health and safety professionals responsible for RAMS standards across programmes or organisations, as well as those compiling evidence for qualifications such as the Level 6 NVQ in Occupational Health and Safety Practice, will recognise that the quality of RAMS is a clear indicator of effective health and safety management on site.
Related blogs

Advice
Asbestos in Construction: What Senior Professionals Must Know

Advice
Manual Handling in Construction: Responsibilities at Every Level

Advice
Risk Assessments and Method Statements: Getting RAMS Right

Advice
Work at Height in Construction: Managing the Risk

Driving Culture and Performance in HS

Education and Training
Strategic Environmental Management – A Key Requirement at Level 7

Near Miss Reporting in Construction

The Competent Person in Construction: More Than a Certificate

How to Prepare for a HSE Construction Site Inspection

Advice
Understanding CDM 2015: A Practical Guide

2024-06-12 16:20:00Advice
Construction Site Inspections: Why They Matter and What to Expect

Education and Training
How to Apply for a CSCS Card: A Step-by-Step Guide for UK Construction

Education and Training
Does a Leisure Facility Require a Health and Safety Certificate?

Education and Training
Successful Health and Safety Case Studies in the UK Leisure Industry

Education and Training
Training for Health and Safety in Leisure

Education and Training
Health and Safety Training Programs in the Leisure Industry

Preventive Measures
Case Studies on Health and Safety Success in Leisure

Preventive Measures
Health and Safety in Leisure Centre Changing Rooms

Workplace Culture
Health and Safety Procedures in Hotels

Workplace Culture
Health and Safety in a Leisure Centre